Projects Archive From 2000 Bond

Projects Completed and Occupied From 2000 Bond

Alderman Elementary School

Project Completed:
August 30, 2002

 

Mendenhall Middle School

Project Completed:
July 6, 2002

Allen Jay Elementary School

Project Completed:
August 1, 2002

 

Millis Road Elementary School

Project Completed:
September 18, 2002

Bessemer Elementary School

Project Completed:
December 18, 2002

 

Montlieu Elementary School

Project Completed:
July 30, 2002

Brightwood Elementary School

Project Completed:
December 31, 2002

 

Northwest High School

Contract Completion Date:
August 9, 2002 for Classroom, Music / Arts & Locker Rooms
Contract Completion Date for Gym: March 31, 2003

Florence Elementary School

Project Completed:
December 20, 2002

 

Northwood Elementary School

Project Completed:
July 30, 2002

Frazier Elementary School

Project Completed:
October 4, 2002

 

Page High School

Project Completed:
May 2004

Gillespie Park Elementary School

Project Completed:
August 2003

Penn Griffin Middle School

Project Completed:
To be announced

Grimsley High School

Project Completed:
March 31, 2003

 

Sedgefield Elementary School

Project Completed:
August 30, 2002

High Point Central High School

Project Completed:
February 11, 2003

 

Sedalia Elementary School

Project Completed:
December 20, 2002

Jamestown Middle School

Project Completed:
September 6, 2002

 

Tomlinson Montessori School

Contract completion date:
January 28, 2003

Kiser Middle School

Project Completed:
April 15, 2002

 

Triangle Lake Montessori School - Building Package

Project Completed:
July 26, 2003

Lincoln Middle School

Project Completed:
August 8, 2002

 

Wiley Elementary School

Project Completed:
October 4, 2002

Lindley Elementary School

Project Completed:
December 19, 2002

 

Projects Under Construction

Dudley High School - Building Package

Dudley is the only project left that was part of the original 2000 bond program. The Dudley project is progressing at the pace it should. In building “A”, the renovated structure, the above ceiling inspection for floors 2 & 3 has been completed for everything except electrical.

In Building “A” the construction electrical trim is 95% complete on the first floor and 95% complete on the second floor and 98% complete on the third floor. The communication is 98% complete on the first floor, and 95% complete on floors two and three. The ceiling grid is 100% complete on all three floors. The fire alarm system is 70% complete on all three floors. The floor tile is 85% complete on the second and third floors. Plumbing trims are 99% complete on the two upper floors and 20% complete on the first floor. Casework is 95% complete on the first floor. Painting is 99% compete on floors one and two. Installation of the lockers is scheduled to begin this week.

In Building “B”, the media center is progressing with cabinets being installed.

The exterior metal panels are 100% complete, the roof trim is 80% complete, the electrical trim is 12% complete, and communications for the media center is 80% complete.

In Buildings “D” and “E”, the 3 story addition, there is still work to be completed on the courtyard. This is creating difficulty in maintaining the interior environment. The courtyard and closing in the rest of the building is scheduled to be done by December 15, 2004. Currently the plumbing is delaying the interior finishes.

The hook up of the kitchen equipment is continuing. The finished floor of the kitchen area is 98% complete and the electrical rough in is 98% complete. The ceiling grid placement is 75% complete. The flooring is 10% complete on the lower level. The store front (window framing, etc.) is 90% complete.

On the first level of the “D” and “E” building the gas meter has been approved for installation. The plumbing is lagging and slowing the finishes. The CMU is 99% complete and the above ceiling plumbing rough-in is 99% complete. The above ceiling electrical rough-in is 99% complete. The ceiling grid placement is 99% complete.

On the second level of “D” and “E” building, the acid piping rough-ins are complete. The fixtures for the bathroom have not been placed for building E. The electrical main runs are in progress and feeder wiring is in progress. The CMU is 98% complete. Plumbing is 80% complete. Brick placement is 99% complete with the brick being placed on the back side of the arch being completed. Electrical rough-in is 80% complete on the second level. Drywall placement is 99% complete.

In Building “C” the computer labs electrical rough-in is 80% complete and communications is 90% complete.

In the courtyard the trench drain for the is 80% complete, the fine grading is 98% complete, and the flat work 90% complete.

The site work under ground is complete and the paving is 80% complete. 98% of the curb and gutters are in place.

Oak Ridge Elementary School

Brick has been completed on the exterior of area “G”. Exterior studs and sheathing is complete on wing “F”, ”C” and three walls of “E” wing. Concrete block walls are complete on “B” and exterior sheathing is 99% complete on wing “B”. HVAC rough-in is complete in wings ”G”, ”F”, “E”, “C” and “B”. Interior studs and frames are complete in “C” administrative wing. Electrical conduit are installed in “C” wing. Structure is completely installed for the canopies and decking has started on parts of the canopies structure. Decking is installed on all the buildings. HVAC drops are being installed in kindergarten wing “G”. Interior studs and door frames are installed in about 50% of wing “E”. Work is progressing in the food service area. Brick is installed on the exterior wall of building “C” that connects to the existing gym. Steel is set between the new building and the portion that will be renovated.

More information

 

In compliance with federal laws, Guilford County Schools administers all educational programs, employment activities and admissions without discrimination because of race, religion, national or ethnic origin, color, age, military service, disability or gender, except where exemption is appropriate and allowed by law. Refer to the Board of Education's Discrimination Free Environment Policy AC for a complete statement. Inquiries or complaints should be directed to the Guilford County Schools Compliance Officer, 120 Franklin Boulevard, Greensboro, NC 27401; 336.370.2323.

All Guilford County Schools facilities, both educational and athletic, are tobacco-free learning environments.

©2008 Guilford County Schools, 712 North Eugene Street, Greensboro, NC 27401 336.370.8100

contact us

Contact Us