Project Update: Brooks Global Studies

  • Latest Project Update (Nov. 5, 2021)

    • ¹Schematic Design is Underway
    • Various Site Options Being Considered
    • ²Survey is underway
    • Traffic study is underway

    1Schematic Design is the first phase in the construction process, followed by Design Development, and then Construction Documents.

    ²Survey is a multi-part process.  We first perform underground utility locating service to mark all the underground utilities on top of the site. These utilities are then located on the final survey for identification during the construction process We then find the entire legal boundary of the project, then verify the topography of the entire site in 1’ increments. Roadways are also identified on the final survey.

Key Project Information

  •  Brooks Design Phase

    BudgetEstimated budget: $22,174,130

    Space Allocations Action: Rebuild and relocate to the old Craven School site

    TimelineTimeline for project

    • Phase: 2
    • Begin date: To be determined
    • Estimated completion date: To be determined

    Bid for Suppliers TimelineBid for bond suppliers timeline: 2022

    Age of the buildingYear built: 1951